SRMS Core Hardware
For properties with up to eight active zones, this node is the control foundation for disciplined SRMS operations.
It is more than a controller swap: deployment includes architecture validation, serviceability checks, and a clear Tier 1 to Tier 3 path.
Use it when your property footprint fits eight zones and you want a structured reliability stack. You can start at Tier 1 and scale to Tier 2/Tier 3 as risk and operational needs evolve.
| Conventional Swap | SRMS 8-Zone Node |
|---|---|
| Replace controller and move on | Validate zones, wiring, and deployment constraints first |
| No formal tier roadmap | Clear Tier 1, Tier 2, Tier 3 growth path |
| Reactive service after failures | Designed for monitored reliability outcomes |
| Unclear accountability on legacy constraints | Scope boundaries documented before install |
Confirm active zone count, valve accessibility, and enclosure feasibility for long-term serviceability.
Inspect wiring condition, power access, connectivity path, and known weak points before final scope approval.
Install with documented standards and verify predictable control behavior across all active zones.
Define requirements for Tier 2 flow monitoring and Tier 3 response path if staged expansion is planned.
It is the core zone-control hardware profile for properties where eight zones cover the irrigation footprint and tiered reliability operations are the goal.
SRMS node deployment includes service-scoped validation, monitoring discipline, and a documented Tier 1 to Tier 3 upgrade path rather than only replacing hardware.
No. It is common in residential systems but can also fit smaller HOA and light-commercial irrigation layouts when zone count and hydraulic profile align.
Yes. Many deployments begin at Tier 1, then add Tier 2 flow protection and Tier 3 response workflows as risk or operating requirements increase.
Not always. Flow monitoring is required for Tier 2 outcomes, but initial scope can be phased based on budget and current risk profile.
Often yes, if condition and layout support reliable operation. We test and document constraints before finalizing scope.
In many cases yes. We confirm compatibility, condition, and accountability boundaries before proceeding with integration.
Pricing is inspection-scoped and based on zone condition, wiring quality, enclosure needs, connectivity requirements, and tier level.
| Industry | Irrigation |
|---|---|
| Program | SRMS |
| Concept | Zone node |
| Zone capacity | 8 |
| Brand | Green Guru LLC |
| Service-line scope | Optimized for typical 1" and 2" irrigation systems |
| Related | Tier 1, Tier 2, Tier 3 |
We'll confirm fit, scope, and the right deployment pattern during an inspection.
Online Booking Request a Free InspectionRelated: SRMS